Risk factors should be included in the contract to protect the interests of the owner. If you do not read the written agreement, you will not be in a defensive position. The supply of products and services is mentioned in the contract between the owner and the contractor. A construction contract is a legal document that binds the two parties to the agreed terms. It mentions the duration of the project, the cost per square metre or per item, the building materials used, etc. An employment contract for the construction of the house in India between the owner and the contractor must be concluded to mention all civil engineering work included in the contractual agreement and excluded. The agreement should mention the cost of different building materials used for the construction of the house. If we are not talking about additional fees, they should be discussed with the housing contractor. If you go for a package for specific extra work that is performed differently than mentioned in the agreement. You should receive a quote if you have to pay additional expenses. Many people regret the importance of a well-documented agreement between the owner and the contractor, which is beneficial to both the parties, including the owner and the developer. Below we discussed the points that we should consider in the mutual agreement.

11. If the owner decides to provide the necessary building materials, he is credited with the cost of these materials and the value is deducted from the current invoice immediately below. If there are changes, they should be made in accordance with the agreement between the owner and the contractor. In most cases, there will be no change. The changes will be minor. For example, the layout of cabinets, wiring and the inclusion of additional power outlets and other aspects may be discussed by the owner, so that his interests are served by the contractor. As long as construction costs are within the price limit, there will be no difficulty in making changes. The owner provides a temporary electrical connection, all taxes on electricity and water during construction are borne by the owner.

The CSLB is the national consumer protection authority, which licenses and regulates entrepreneurs.